Requirement

Hatchpen is a large house with a 3-phase supply and consumption of 60,000kWh a year. They required a solar PV system along with battery storage to power the house and reduce their energy bills.

Our Solution

Approaching Titan Eco it was determined that the best solution would be a ground mounted solar installation in an adjoining field. We installed 100 x JA Solar 410w panels with a 3 x 3-phase 10kW Huawei hybrid inverters and 30kWh of storage capacity.

Performance

With low generation and the batteries not set to off-peak charge the customers energy bills dropped by 36% in February. These savings will increase as we start to enter the longer warmer days of spring, summer and autumn.
The system will generate circa 40,000kWh a year and save the customer over £13,000kWh a year with a payback period of around 4-years.

Please note: The savings quoted in these case studies are indicative and will vary depending on the size of your system, your annual energy generation, and ongoing electricity costs. Actual savings may differ.

YOU MIGHT ALSO LIKE…

  • A new build home with solar panels